
Don’t look now, Las Vegas but we may have another failsino on our hands. Construction has ground to a total halt on Dream, the south-Strip resort project that looked like a sure thing not so long ago. Developer Bill Shopoff is as much as $30 million in hock, stalling work on Dream. Shopoff is evidently renegotiating with his principal lender, for reasons undisclosed. (Cost overruns?) With a budgetary cap of $575 million, Dream has been proceeding so far from cash on hand, leaving it $400 million-plus short of the finish line. That’d require a “bridge loan” big enough to span Long Island Sound.
Continue reading A Dream deferred; Lost Virginity; Tennessee tax trouble







